WE-ATTACH source-led buying guide · Updated 2026-11-17 · Project and technical approval are separate from this guide.

This guide organizes the supplied WE-ATTACH material into an information checklist for the proposed purchase. It does not replace the model-specific approved drawing or operation instructions.
State the earthwork task
Provide the material, proposed work, machine reach and site constraints. The WR references are retained as catalogue models.
Check the interface
Prepare the pin/centre/width measurements, model/year and relevant drawing. Compare geometry rather than assuming that adjacent model names are interchangeable.
Confirm the duty
Ask for the approved model configuration and operating information for the proposed material before ordering.
Information to send next
Carrier, pin geometry, material, reach and working envelope. A tonne class alone is not fitment approval. Include quantities, destination, available drawings and the unresolved questions.
Supply and evidence responsibility
WE-ATTACH connects attachment selection, configuration requirements and coordinated supply, supported by our warehouse and hillside testing site. Core manufacturing partners produce our attachments. Manufacturing facilities, staff and certificates must be attributed to the responsible partner and the applicable product.
Source and document traceability
Catalogue transcription for preliminary review. Confirm the applicable configuration and current approved revision before order.
- Excavator Attachment Catalogue ↗ · PDF physical page 36
