MAKE THE REQUIREMENT SPECIFIC
Work conditions to carry into selection.
Record diameter, depth and the ground description. Compare the drive hydraulic requirements with the machine, then keep the output shaft and mounting in the same review.
| Tool choice | Information to provide | Applicable conditions |
|---|---|---|
| Auger Drives ↗ | Machine/circuit; ground; hole diameter/depth; output shaft; auger/extension/teeth and mounting. | Reference soil categories are not a geotechnical test specification; drilling depth and maximum values require conditions. Keep the documented WD-source conflicts open until an approved revision is identified. |
Compare the relevant product configurations.
Source-listed models for further review.
Auger Drives ↗
Read the selection guidance.
BUYING GUIDE
Select an auger drive as a drilling configuration
Record the required hole diameter/depth, ground description, obstructions, machine and work arrangement. The soft/medium/hard descriptions in the brochure are reference categories, not a measured geotechnical specification.
Read the guide →BUYING GUIDE
From a hole requirement to an auger configuration
Record required hole diameter/depth, ground description, access and the proposed machine. Keep the soft/medium/hard brochure labels as source reference categories rather than measured geotechnical specifications.
Read the guide →Original product information.
PDF · 48 PAGES
Excavator Attachment Catalogue
View the original pages and retain the relevant version with your enquiry.
PDF · 28 PAGES
Auger Drive Selection Guide
View the original pages and retain the relevant version with your enquiry.
Continue through the work.
Complete the drilling string
Choose the auger, extension, teeth and pilot for the proposed ground and connection. An extension length does not by itself establish achievable drilling depth.
Explore the scenario →Drilling & FoundationsTreat pile work as a separate task
For a pile, provide section, length, grip arrangement, access and reach. Keep RD-type family information separate from the modelled WTV range until the exact technical package is identified.
Explore the scenario →