START WITH THE WORK
Plan the breaking, trench and backfill sequence.
Break the defined work area
State pavement/material, access and working duty. Review the breaker, bracket/tool and machine circuit for the proposed task rather than assuming a road application establishes fitment.
Explore this work scenarioClean and shape the trench
Give working width, ditch/slope profile, reach and clearance. Separate fixed cleaning geometry from the need to tilt a tool, then confirm mounting and any auxiliary circuit.
Explore this work scenarioCompact the placed fill
Provide fill description, access and plate dimensions with the carrier and hydraulic/return data. Compaction conditions belong with the proposal; the catalogue is not a site acceptance record.
Explore this work scenarioKeep the tool-change record
Where several tools share a machine, retain the actual interface measurements, locking method, circuits and relevant documents for each configuration.
Explore this work scenarioThe material and work stage
Road and utility work often combines several stages: localized breaking, trench cleaning, surface finishing and backfill compaction. Define the work area and conditions for each tool.
Information for the configuration review
Pavement/material and work area; access; trench/working geometry; machine/circuit; installation and operation documents.
Documents to keep with the proposal
Keep the complete model/suffix, machine and mounting information with the relevant drawing and operating requirements. The work stages above identify the product and document paths for this application.
Application scope
These are selection pathways drawn from the supplied product material. Confirm the exact configuration and site conditions; no customer project or measured site result is represented by the product photographs.
Start with the relevant attachment family
Hydraulic Breakers
Review light, medium, heavy and fully hydraulic catalogue references. The bracket, housing and tool remain part of the configuration.
Explore ↗Buckets
Compare crushing, screening, clamshell, cleaning and digging tasks; the supplied image range also includes tilt, rock and multi-purpose buckets.
Explore ↗Plate Compactors
Review WVC and WEC catalogue configurations for compaction tasks; compare weight, geometry and the hydraulic requirement.
Explore ↗Quick Couplers
Review hydraulic, cast, double-lock, tilting and rotating couplers. Match both interfaces and the locking/circuit requirements.
Explore ↗Model references and source specifications for this industry
Hydraulic Quick Couplers ↗
| Complete model | Source specification snapshot | Details & download |
|---|---|---|
| WHC01 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC02 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC03 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC04 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC06 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC08 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC10 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC14 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHC17 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
Vibratory Compactors ↗
| Complete model | Source specification snapshot | Details & download |
|---|---|---|
| WVC02 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WVC04 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WVC08 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WVC15 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WVC20 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WVC30 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
Upgraded Vibratory Compactors ↗
| Complete model | Source specification snapshot | Details & download |
|---|---|---|
| WEC04 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WEC06 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WEC15 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WEC20 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
Tilt Buckets ↗
| Complete model | Source specification snapshot | Details & download |
|---|---|---|
| WTB01 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WTB02 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
Light-duty Hydraulic Breakers ↗
| Complete model | Source specification snapshot | Details & download |
|---|---|---|
| WHB35 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB40 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB45 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB53 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB60 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB68 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB75 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB75/80 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB85 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
| WHB100 ↗ |
| All parameters and conditions ↗ Download reference · CSV ↗ |
Selection and purchase guidance

Hydraulic breaker selection and order inputs
The supplied material separates light, medium, heavy and fully hydraulic breaker references and side/top/box dimensions. Compare the same housing, bracket and tool arrangement.
Explore ↗
Plate compactor project information
Record compaction location, material, working area, access and the required project outcome. Catalogue compaction claims are not treated as verified site results.
Explore ↗Source and document traceability
Catalogue transcription for preliminary review. Confirm the applicable configuration and current approved revision before order.
- Product Type Reference Brochure · Selected Pages ↗ · PDF physical page 8
