Excavator attachment supply · Ningbo, China Search · FAQ · Support · Market / EnglishWhatsApp +86 15058273161
WE-ATTACH

Demolition & Recycling / WORK SCENARIO

Specify the steel-cutting step

Give the material section, thickness and required mounting position. Jaw opening and a generic shear name do not establish the cutting capability for your steel.

MAKE THE REQUIREMENT SPECIFIC

Work conditions to carry into selection.

Give the material section, thickness and required mounting position. Jaw opening and a generic shear name do not establish the cutting capability for your steel.

Product-specific inputs for this work stage
Tool choiceInformation to provideApplicable conditions
Hydraulic Steel Shears ↗Steel/section; opening; cutting-force definition; mounting position; cylinder/rotation circuits; approved model drawing.The steel-shear parameter and dimension headers conflict. Keep their tables separate; comparative efficiency, blade-life and strength figures are not treated as verified results.
Eagle Shears ↗Section/material; required opening; mounting head/position; reach; rotation/cylinder circuits and current drawing.No underwater depth, “first” claim, comparative wear percentage or unsupported force value is inferred. Mounting reach and machine stability need project review.

Compare the relevant product configurations.

Source-listed models for further review.

Hydraulic Steel Shears ↗

Model-specific source values · original fields and units retained
Complete modelSource specification snapshotDetails & download
WHS08 ↗
SUITABLE EXCAVATOR, T
6-13
CYLINDER OIL FLOW, L/MIN
50-100
MOTOR OIL FLOW, L/MIN
20-30
Source P03 · p.15 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WHS25 ↗
SUITABLE EXCAVATOR, T
18-27
CYLINDER OIL FLOW, L/MIN
180-240
MOTOR OIL FLOW, L/MIN
30-50
Source P03 · p.15 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WHS30 ↗
SUITABLE EXCAVATOR, T
20-30
CYLINDER OIL FLOW, L/MIN
180-240
MOTOR OIL FLOW, L/MIN
30-50
Source P03 · p.15 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WHS40 ↗
SUITABLE EXCAVATOR, T
30-40
CYLINDER OIL FLOW, L/MIN
180-240
MOTOR OIL FLOW, L/MIN
30-50
Source P03 · p.15 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WHS55 ↗
SUITABLE EXCAVATOR, T
45-60
CYLINDER OIL FLOW, L/MIN
300-500
MOTOR OIL FLOW, L/MIN
40-60
Source P03 · p.15 ↗
All parameters and conditions ↗
Download reference · CSV ↗

Eagle Shears ↗

Model-specific source values · original fields and units retained
Complete modelSource specification snapshotDetails & download
WES08 ↗
SUITABLE EXCAVATOR (ARM TYPE), T
6-10
SUITABLE EXCAVATOR (BOOM TYPE), T
/
CYLINDER OIL FLOW, L/MIN
60-120
Source P03 · p.17 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WES18 ↗
SUITABLE EXCAVATOR (ARM TYPE), T
13-20
SUITABLE EXCAVATOR (BOOM TYPE), T
8-14
CYLINDER OIL FLOW, L/MIN
140-240
Source P03 · p.17 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WES25 ↗
SUITABLE EXCAVATOR (ARM TYPE), T
20-35
SUITABLE EXCAVATOR (BOOM TYPE), T
13-25
CYLINDER OIL FLOW, L/MIN
180-240
Source P03 · p.17 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WES40 ↗
SUITABLE EXCAVATOR (ARM TYPE), T
30-38
SUITABLE EXCAVATOR (BOOM TYPE), T
20-28
CYLINDER OIL FLOW, L/MIN
200-250
Source P03 · p.17 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WES50 ↗
SUITABLE EXCAVATOR (ARM TYPE), T
40-60
SUITABLE EXCAVATOR (BOOM TYPE), T
35-40
CYLINDER OIL FLOW, L/MIN
300-500
Source P03 · p.17 ↗
All parameters and conditions ↗
Download reference · CSV ↗
WES60 ↗
SUITABLE EXCAVATOR (ARM TYPE), T
60-70
SUITABLE EXCAVATOR (BOOM TYPE), T
40-50
CYLINDER OIL FLOW, L/MIN
300-560
Source P03 · p.17 ↗
All parameters and conditions ↗
Download reference · CSV ↗

Read the selection guidance.

Original product information.

PDF · 48 PAGES

Excavator Attachment Catalogue

View the original pages and retain the relevant version with your enquiry.

Continue through the work.

Demolition & Recycling

Separate structural breaking from rubble processing

State whether the material is still part of a structure or already on the ground. Include section size, reinforcement, access and desired result before comparing a breaker, crusher or pulverizer. Compare the supplied crusher and pulverizer forms separately; a rotation or magnet arrangement does not establish a different concrete-processing or lifting rating without the applicable model data.

Explore the scenario →
Demolition & Recycling

Sort and transfer the material

Describe the mixed material, size, shape and expected handled load. Select jaw/tine form and rotation needs separately from the machine lifting envelope.

Explore the scenario →
Demolition & Recycling

Define size reduction or separation

Crushing reduces material size; screening separates a specified fraction. State feed conditions, moisture and intended output so the process can be discussed clearly.

Explore the scenario →
Demolition & Recycling

Separate the dismantling tool from the holding frame

For a vehicle-dismantling proposal, describe the material, access and required work sequence. The dismantling shear is a cutting configuration; the pressing frame is a separate holding arrangement. Keep their mounting, carrier and hydraulic information distinct and request the relevant drawings for the proposed setup.

Explore the scenario →
Demolition & Recycling

Identify the breaker and its lubrication requirements

Keep the full breaker model, lubrication points and operating information with the service requirement. An automatic grease device is a support component, not an alternative breaking tool. Confirm the actual connection, lubricant requirements and service instructions for the proposed breaker configuration.

Explore the scenario →

CONTINUE YOUR REVIEW

Related information for your next decision

Discuss your machine, application and configuration →

What do you need to do?

Start with part of a model or describe the job. Suggested results are for selection review.