WE-ATTACH source-led buying guide · Updated 2026-11-17 · Project and technical approval are separate from this guide.

Use this guide to organize the supplied product information around the purchasing task. The exact model, machine and approved configuration remain part of project review.
Describe the hole first
Record required hole diameter/depth, ground description, access and the proposed machine. Keep the soft/medium/hard brochure labels as source reference categories rather than measured geotechnical specifications.
Connect the components
Compare drive output shaft, auger, extension and ground tool as a proposed set. The supplied auger guide has four ground-tool and wear-part pages after the drive models.
Read the drive record
Keep flow, pressure, torque, dimensions and referenced depth conditions with the exact drive model. Separate maximum values do not establish one operating point. Source conflicts such as WD5 dimensions remain open until the current drawing is confirmed.
Prepare the project enquiry
Send machine identity and circuit data, mounting/output interface, hole/ground requirements, proposed tooling, quantity and destination. Ask for the model-specific drawing and applicable operating information.
Source and document traceability
Catalogue transcription for preliminary review. Confirm the applicable configuration and current approved revision before order.
- Excavator Attachment Catalogue ↗ · PDF physical page 4
- Auger Drive Selection Guide ↗ · PDF physical page 24
- Auger Drive Selection Guide ↗ · PDF physical page 25
- Auger Drive Selection Guide ↗ · PDF physical page 26
- Auger Drive Selection Guide ↗ · PDF physical page 27
